Friday, July 12, 2013

Kitchen Work Starts

IKEA boxes arrive - all 154 packages.

Henrik just loves the stick pictures with no text.

Just what are you looking at?  HK gets right into the kitchen building job!

Roll front cabinets ready to be installed.

Upper cabinets await installation also....

along with the wall oven and one base cabinet...only 10 more boxes to build. Then doors, shelves, drawer slides, handles, counter top, butcher block, cook top, dishwasher.......etc...

AO building cabinets on the floor.

Frodo sleeps through most of the commotion.  Being deaf has some benefits.



No comments: