Tuesday, September 28, 2010

Concrete columns poured

The concrete has been poured for the pillars that the big rock will sit on.

Saturday, September 25, 2010

Footings for Big Rock, Ramp Prep and Rainscreen

The base for the big rock has been dug and concrete poured in to stabilize it.

Rebar was drilled into the rock first to make sure the base is solidly attached

HK covers the cement base for the ramp onto the deck.
In the background progress on the rainscreen happened on a couple more walls.

Sunday, September 19, 2010

More Progress

The rainscreen placement has started, the last layer will be the bricks.
We'll both be happy when there is no more work left on the outside walls.

Autumn Garden

It has been a year of rest for the apple trees, very few apples have been produced.
The garden has given it's best for the summer, though winter lettuces are coming up.

Saturday, September 11, 2010

Rain Screen

The outside of the house looks very different now that the Tyvek is covered.

Half Timbers

The cedar will be painted dark brown once it has dried out.
HK has almost all of the half timbers completed.

Friday, September 3, 2010

HK's Big Rocks

Off Loading Big Rocks
The proud owner of 6.5 tons of K2 Stone
Smaller, very distinctive rocks.
Close up of large white vein.

Wednesday, September 1, 2010

Autumn Colours and Quail Family

Salvia
Lemon Gem and Salvia

A family of 16 quails has moved in.