Figuring out how and where to start the floor was one of the biggest challenges of the day. Along with no manual for the nailer, a compressor with an attitude and a lot of time consumed cutting angled pieces, it was a slow start to the flooring project.
By the end of the day we had the hang of it; the pieces on the left of the image are nailed down and the ones to the right are just dry fit together waiting to be moved into place and nailed down.
No comments:
Post a Comment