The mudroom clean-up makes the space much more useable. |
HK's cool seat with slipper storage |
Slipper storage seat from the side. While it pours with rain outside, HK is at work in the sunroom, getting it ready for tiling. |
The post bases for the outside railing have been installed. Now we're just waiting for the railings and glass to be delivered. |
The rockwork on the ramp is almost finished. |
No comments:
Post a Comment