Sunday, March 13, 2011

Inside Stuff and Outside Stuff


The mudroom clean-up makes the space much more useable.

HK's cool seat with slipper storage

Slipper storage seat from the side.


While it pours with rain outside, HK is at work in the sunroom, getting it ready for tiling.

The post bases for the outside railing have been installed.
Now we're just waiting for the railings and glass to be delivered.

The rockwork on the ramp is almost finished.


No comments: