Sunday, July 18, 2010

Tile Washing and Floor Prep

The scratch coat was added on top of the wires for the in-floor heating system.
It took all day and resulted in rather sore muscles.
HK put all the slate tiles out and washed the dust from their surfaces.
They dried inside overnight and are now ready to be installed in the entryway.

No comments: