Saturday, February 4, 2012

A Few Important Developments

The head banger beam has been pushed up into the ceiling in the basement.

The wiring has been put in place and connected to the lights, outlets and switches.  This will all be completed once the drywall has gone on. 

One of the results of wiring is that the insulation has had to come out.
The house is rather chilly and full of fibreglass dust. 

CK's collection of staples, nails and screws from all the framing lumber that was removed.

Ants at Work

This what carpenter ants can do to a perfectly good 2x6.  When we moved in there were ants in the walls of the master bedroom; we used some boric acid (aka Kill the Queen) to kill them and didn't give it another thought.  Fortunately for us, this was as far as the damage went and nothing was structurally unsound, this could have become a whole lot worse if we hadn't caught it when we did.  Taking all the drywall off and replacing it has at least given us the peace of mind to know there were no more ants attacking our house. 

The ends of the 3 affected 2x6's.

More Plumbing Progress and Rubble

Rubble left on the carpet downstairs from all the holes drilled for plumbing today.

Close up view of the plumbing rubble...

The taps and supply lines for the new laundry room and guest bathroom shower stall were put in place today.

The future location of the guest bathroom sink. 

Saturday, January 21, 2012

Plumbing Progress

The future ensuite bathroom toilet drain and future vent stack have been put in place.


View from the side of the ensuite, you can see the drain hole for the future shower on the floor on the far left.
The shower stall in the guest bathroom. 

Plumbing underneath the ensuite bathroom.

Plumbing underneath the guest bathroom.

Sunday, January 15, 2012

New window on the left and the skylight hole opened above the window on the right.
Next week the old window will be removed and replaced with two windows that will be above the kitchen sink.

View into the kitchen skylight, next week Ray will build the framing around all the skylights.

The new guest bedroom window has been installed.
The bedroom will be much improved with an opening window. 

The view into the guest bedroom skylight.

Wednesday, January 11, 2012

Clean Up and End Wall Removal

The drywall mess has been cleaned up and CK took it all to the recycle depot.

The wall between the former master bedroom and the great room is now just a plastic sheet.

The view from inside the Great Room.  It's still very hard to visualize what the space will look like once the plastic and door come down. 

Even with the door open you can't really get a feel for the area just yet. 

Tuesday, January 10, 2012

Second Day of Smashing

When I took this picture on Sunday there was a hall closet and linen closet in front of this. This space becomes the guest room; it's going to be a really good size.

This is the door onto the cement deck.  On the left side of the studs used to sit the bathroom counter and sink.

This was the master bedroom with the big window looking out onto the deck, behind the studs was the ensuite.

A look down the long dark hall at night.  It doesn't look a thing like it did two days ago.

Looking back towards the stairs to the tower room.  The green insulation is where the old front door used to be.