Pictures have been hung in the spare bedroom. The bed frame and side tables/bookshelves have been ordered; we hope to have those before Christmas. |
The bathroom tiling is coming along nicely. The floor had to receive another scratch coat with a wire mesh support as the mosaic tiles were a little small for the Ditra mats to work properly. |
Henrik has cleared out the baseboards and window frames from the great room in preparation for hardwood flooring. |
The baseboards and window trims are now hanging out in the basement awaiting their turn at installation. |
No comments:
Post a Comment